Installation Process For Various Styles Of Wooden Floors

Flooring Installation Techniques

Professional contractors install hardwood flooring by considering various factors. There are different installation methods available, and choosing the right method is important to ensure proper installation. Common methods of installation are Nailing, Gluing, and Floating. The right flooring installation process in Mississauga is determined by the subfloor on which the hardwood flooring is installed. Innovative techniques like waterproof core, sound insulation, and luxury vinyl tiles that can be installed alongside carpets without transition strips are some of the emerging trends in the flooring industry, according to the Databridge Market Research review report.

Nail Down Process

The most commonly used method is the nail-down process, in which the planks are adequately and sturdily nailed to the floor. This installation method is typically used on wooden subfloors to install ¾ inch thick strips or solid wood planks. Professionals use the process of blind nailing in which the nails are inserted into the boards’ tongue so that it will be covered when the next board is in place.

Glue Down Method

This method uses adhesives to stick the flooring material directly to the subfloor or a moisture barrier installed on top of it. Choosing the right adhesive is done based on the factors like ease of use, product performance, and volatile organic compound (VOC) regulations in place in the area of installation. In the dry-lay method, the adhesive needs to dry for the time mentioned by the manufacturer before laying the wood. The flash time varies depending on the temperature and humidity of the place. You can install the floor immediately on the adhesive in the wet-lay method. After completing the flooring, you must clean any spills and drips of adhesives on top of the floor before it dries.

Floating Installation

In this method, the planks are neither glued nor nailed to the subfloor. They float on top of the surface. Houses with cement or tile subfloors use the floating installation method. This process is usually done for laminate and engineered wood flooring. The boards are attached using a pre-built click-together system or glue. The clicking mechanism blocks out the moisture, and such floors are beneficial in areas where the temperature and humidity levels fluctuate more. Since the entire floor moves as one unit, they are easier to install and are durable.

Site Preparation

The subfloor needs to be sanded and prepped before the installation process. This step will ensure that the flooring does not have high or low spots. You should test the building for elements that might impact the wood, like moisture, humidity, or other wet construction work. To achieve a superior finish, begin the installation only after completing all the other works at the site. The performance of the wood flooring depends on the dryness of the subfloor. So you should check the crawlspaces and basement for proper ventilation. Once all these factors are verified, you should acclimate the wood to the site’s conditions before beginning the installation. This action will prevent the floorboard from forming splits and cracks later.